Japan News (Yomiuri Shimbun)
November 20, 2022 (Kumamoto, Japan)
Locomotive No. 58654 was produced in 1922 and served various parts of Kyushu before being decommissioned in 1975, clocking up 3.34 million kilometers, equivalent to 84 times the circumference of the Earth. The train was revived in 1988 to operate on the Hohi Line under the name SL Aso BOY. The train was removed from service again in 2005 due to damage, but its operation resumed in 2009, as SL Hitoyoshi, after repairs to run as part of a sightseeing service on Kyushu Railway Co. (JR Kyushu)’s Hisatsu Line.
Torrential rain in July 2020 caused serious damage along the line, so services were unable to run until recently. The train now runs on the Kagoshima Line between Kumamoto and Tosu, Saga Prefecture.
JR Kyushu announced the company would discontinue the operation of SL Hitoyoshi in October due to difficulty obtaining spare parts for the train. Passenger numbers also sharply dropped because of the novel coronavirus pandemic.
All 132 seats for the special run were fully booked. A 53-year-old homemaker from Saga recalled, “I remember riding this train with my child when they were small. I’m sad that it will be retired.”
A birthday cake was unveiled during a ceremony held at JR Yatsushiro Station to celebrate the anniversary. JR Kyushu President Yoji Furumiya said about 900,000 passengers had used the locomotive since its revival 30 years ago. Furumiya said, “We’d like to repay everyone’s kindness through full-fledged efforts to operate the locomotive before its retirement at the end of fiscal 2023.”
Source
https://japannews.yomiuri.co.jp/features/travel-spots/20221120-72261/
Recommended for you
The UAE-Oman Railway Link (Hafeet Rail) signaling contract is won by Siemens Mobility and Hassan Allam Construction
24 April 2024 (UAE) The 303-kilometer project is the first cross-country undertaking in the Middle East and Arab World, linking the capital city of Abu Dhabi, United Arab Emirates, with Sohar, Sultanate of Oman. The network's Oman segment is the Sultanate of Oman's first-ever railway system delivery. Over the 303-kilometer Abu Dhabi – Sohar railway link, Siemens Mobility and Hassan Allam Construction will provide the design, construction, and integration of the ETCS Level 2 signaling, telecom, and power supply systems. Source https://press.siemens.com/global/en/pressrelease/siemens-mobility-together-hassan-allam-construction-wins-signaling-contract-uae-oman
2 days ago
Read MoreIn order to modernize the Portuguese railway infrastructure, Thales secures three major contracts
18 April 2024 (Portugal) Together with partners SISINT and CONECTICABO, Thales has successfully negotiated three large contracts worth over 10 million euros to upgrade the mainline railway in Portugal. The Portuguese mainline railway infrastructure's quality, safety, and operation will all be considerably raised by these projects. With many successful signaling system renewal contracts under its belt, Thales is well-positioned to be a major player in the overall modernization of the telecom network. Source https://www.thalesgroup.com/en/worldwide/transport/press_release/thales-secures-three-major-contracts-modernize-portuguese-railway
2 days ago
Read MoreThe first anniversary of the China-Laos international passenger train's inaugural operation
15 April 2024 (China) The first anniversary of the China-Laos international passenger train's operation was celebrated on April 13. All told, the train has carried 700,000 passengers, 180,000 of whom were cross-border travelers from 87 different nations and regions. The operation is secure, steady, and well-organized, with a 100% departure and 99% arrival on-time percentage, respectively. Source https://www.crrcgc.cc/en/g7389/s10408/t347740.aspx Picture Courtesy http://english.scio.gov.cn/beltandroad/2023-04/13/content_85226948.htm
3 days ago
Read More